Spring
opens 1 March
- design ready
- order confirmation
- materials on site
- building, because the shop is quiet
- finishing and filling
The industry wheel
Twelve months, two rings, and two dates everything hangs on.
On an ordinary year planner, Christmas planning sits somewhere in May, far away, between other things. On a circle it sits directly opposite the Christmas opening. Then you see with your own eyes that the two seasons chase each other, and that what is left undecided in April comes back in October as haste.
That is the whole argument. A list cannot show it, a wheel can.
On a small screen the wheel is a picture, not a map. The table below holds the same information, readable.
| Month | What the shopper sees | Where the decision falls |
|---|---|---|
| January | Winter, quiet shop | Annual plan |
| February | Winter, quiet shop | None |
| March | Spring and garden season | None |
| April | Spring and garden season | Christmas planning |
| May | Spring and garden season | Christmas planning |
| June | Spring and garden season | Christmas quote |
| July | Spring and garden season | Christmas orders |
| August | Spring and garden season | Spring design |
| September | Transition | Quote and order |
| October | Christmas show | None |
| November | Christmas show | Survey and scan |
| December | Christmas show | Material on site |
opens 1 March
opens 1 October
Drag the blue pin around the wheel to pick any day of the year, or focus it with Tab and use the arrow keys.
Outer ring. The two seasons as the customer experiences them. Spring opens on 1 March, the Christmas show stands on 1 October. Everything in between is shop, not shop window.
Inner ring. Planning, quote, ordering, material on site. This is the ring where we sit, and the only ring where you still have a hand on the wheel.
The two pills. The only two dates that are fixed. Everything else on this wheel is derived from them.
The blue pin. It points at today and moves with the calendar. Drag it to any other day; the label tells you where you are.
The red arrows. From each opening date an arrow runs back through the rings to the moment the decision falls. Where the arrow ends, you need to be at the table.
Two tracks
Fourteen weeks of lead time is the worst case, with ordering in China and shipping. Usually it is six to eight. So plenty is still possible after the end of August, only no longer at the best prices.
That is where the tension sits. At the end of August the garden furniture is still selling and there is turnover left to take. Those are exactly the square metres you give up for a Christmas department that has to be finished on 1 October.
Track B is not on the wheel, on purpose. Optimising with existing shopfitting can be done almost all year round and takes six to eight weeks. It has no fixed moment, so it has no place on a circle. That is exactly what makes this track attractive for anyone who missed the window.
The wheel shows how the garden centre year runs. Store OS puts your own store's calendar next to the floor plan, week by week.
See Store OS
What you do with it
Once a month we write what we see from our side of the table, and where the pin stands. Twelve letters, one continuing story.